CHAIN 177155 / EXTERNAL CONTROL PLANE
72-HOUR RELIABILITY CAMPAIGN
CONNECTINGTELEMETRY HANDSHAKE
- ELAPSED
- --:--:--
- REMAINING
- --:--:--
- COMPLETION
- --
CAMPAIGN PROGRESS0.000%
START24H48H72H
LIVE ACCEPTANCEEVALUATING
UPTIME100.00000%
RPC ERRORS0 REQUIRED
RPC P95≤ 1,000 MS
DRILL FAILURES0 REQUIRED
Controller telemetry gaps are retained in the hash-chained evidence journal. RPC errors, validator health, latency, and drill failures remain the network acceptance gates.
OFF-TRACK DIAGNOSTICS
FAILURE TRACE
RECENT0
- NO FAILED SAMPLES RECORDEDTHE CURRENT CAMPAIGN IS CLEANCLEAR
CONTROLLED FAILURE LEDGER
RECOVERY DRILLS
COMPLETED0 / 0
- AWAITING CAMPAIGN STATEDRILL SCHEDULE NOT YET PUBLISHED--
EVIDENCE HEAD
AWAITING FIRST EVENTFINAL REPORT
PENDING CAMPAIGN COMPLETION